• Home
  • About The Herald
  • Local Agencies
  • Daily Email Update
  • Legal Notices
  • Classified Ads

Contra Costa Herald

News Of By and For The People of Contra Costa County, California

  • Arts & Entertainment
  • Business
  • Community
  • Crime
  • Dining
  • Education
  • Faith
  • Health
  • News
  • Politics & Elections
  • Real Estate

Rep. DeSaulnier advances over $46.7 million for local projects in Contra Costa, Alameda counties

April 1, 2026 By Publisher Leave a Comment

Budget requests for infrastructure, transportation, community development, public and environmental health and safety

$10 million for Vasco Road safety & mobility improvements

By Mairead Glowacki, Communications Director, Office of Congressman Mark DeSaulnier

Washington, D.C. – Today, Congressman Mark DeSaulnier (CA-10) announced that he advanced over $46.7 million for 20 projects to benefit Contra Costa and Alameda Counties for consideration by the U.S. House Committee on Appropriations as part of the Fiscal Year 2027 appropriations process. These projects would help to improve quality of life for the people of California’s 10th Congressional District by upgrading infrastructure and transportation accessibility and increasing public and environmental safety.

“Simply put, my number one priority in Congress is to make life better for the people I represent, and the $46.7 million we are advancing will help to do just that by investing in safety and easing congestion for drivers, bikers, and pedestrians alike, housing, emergency preparedness, crime prevention, and more,” said DeSaulnier. “I am continuously grateful to our local governments and organizations for their thoughtful project submissions, and I look forward to fighting to see the projects through the legislative process to bring this important funding home.”

Infrastructure Upgrades, Transportation Accessibility, and Community Development Projects:

  • $5,000,000 for the County of Contra Costa to design a new roadway connection that will improve regional mobility between Contra Costa and San Joaquin Counties using a connector route that shifts interregional traffic from Byron Highway and local roads in the Town of Byron to Vasco Road, to accommodate higher traffic volumes.
  • $5,000,000 for the County of Contra Costa to construct safety countermeasures along a 12.1-mile segment of Vasco Road between Marsh Creek Road and the Alameda County line in unincorporated Byron, California to decrease the number of accidents on this busy thoroughfare.
  • $4,000,000 for the City of Brentwood to construct infrastructure and site improvements to prepare a site to house the Brentwood Agricultural Technology Innovation Center.
  • $2,800,000 for the City of Lafayette to construct the Brown Avenue to Pleasant Hill Road segment of the Aqueduct Pathway, a fully accessible Class I separated bicycle and pedestrian facility located within the East Bay Municipal Utility District (EBMUD) aqueduct corridor in downtown Lafayette, California.
  • $2,000,000 for East Bay Regional Park District to construct a dedicated bus staging and drop-off area designed to accommodate regional transit agencies and other visitors, and remove aging rail infrastructure to replace it with accessible, multi-use pathways as part of the second phase of a project to allow for the Thurgood Marshall Regional Park to be opened up to the public.
  • $2,000,000 for the City of Lafayette to construct a 48-unit development of supportive and affordable housing for individuals with intellectual and developmental disabilities.
  • $2,000,000 for the City of San Ramon to continue buildout and close gaps in the citywide fiber optic network supporting transportation operations, public safety, and future smart city technologies.
  • $1,750,000 to the City of Walnut Creek to install a new traffic signal at the intersection between Treat Boulevard and Arkell Road in Walnut Creek, California, which is currently controlled by stop signs.
  • $1,500,000 for the County of Contra Costa to construct separated wheeled (bicycle, e-bike, and scooter) and pedestrian pathways in the Iron Horse Corridor from Bollinger Canyon Road to Crow Canyon Road in the City of San Ramon to separate wheeled and pedestrian modes and improve user safety.
  • $1,300,000 for the County of Contra Costa to construct a new youth center in Brentwood, California that will provide academic counseling and employment training in the culinary field.
  • $1,296,000 for the City of Orinda to complete pavement rehabilitation work and widening on the Camino Pablo Pathway in Orinda, California to expand and maintain aging infrastructure that currently sees heavy pedestrian use.

Public and Environmental Health and Safety:

  • $5,000,000 for the City of Concord to make improvements to the City of Concord’s Emergency Operations Center (EOC) to ensure that it can continue to function as a critical hub for regional preparedness, response, and recovery efforts during emergencies and disasters.
  • $3,150,000 for Central Contra Costa Sanitary District to add Densified Activated Sludge (DAS) technology to Central San’s existing large-scale Membrane Aerated Biofilm Reactor (MABR) demonstration site and share results with wastewater agencies across the region. DAS and MABR are complementary, cutting-edge technologies that could enhance nitrogen removal and environmental protection while leveraging existing treatment facilities.
  • $2,000,000 for the City of San Ramon to replace the Police Department’s aging Records Management System (RMS), associated software, and supporting equipment. The project will modernize the City’s public safety technology infrastructure by implementing a next-generation RMS, preserving and migrating existing police records, and integrating with electronic files. The project may also incorporate a unified interface that allows officers and investigators to securely access data from multiple regional law enforcement systems within a single platform, improving efficiency, and reducing the need to switch between separate applications.
  • $1,800,000 for the County of Contra Costa to build two mobile communications sites to enhance the resiliency of first responder radio communications in the event of a natural disaster or other widespread threat.
  • $1,684,990 for the City of Antioch to establish a Real-Time Operations Center (RTOC) to serve as the Antioch Police Department’s central hub for intelligence and information-sharing, integrating existing technologies—including gunshot detection, public safety cameras, and Computer-Aided Dispatch (CAD)—into a unified, citywide system that enhances crime monitoring, investigative efficiency, and officer response.
  • $1,650,000 for the County of Contra Costa to expand Contra Costa County’s ability to prioritize and investigate unsolved nonfatal and fatal violent crime, prevent future crimes, and enhance victim/witness safety through coordinated, data driven investigations, focused prosecution, and survivor support services.
  • $1,000,000 for the City of Orinda to maintain and improve the North Orinda Shaded Fuel Break to reduce the probability of catastrophic fire spread while improving firefighter access and operational effectiveness, specifically by maintaining previously treated areas, conducting hazard tree identification and abatement, and expanding interagency coordination.
  • $936,930 for the Town of Moraga to replace and upgrade existing police radios, a combined total of 65 handheld portable radios and 44 vehicle mounted mobile radios, used by the Lafayette, Moraga, and Orinda police departments.
  • $923,000 for Mt. View Sanitary District to initiate pump station and collection systems upgrades by studying the root causes of system stress and the most efficient and effective repair methods.

“For over 135 years the Iron Horse Trail has connected communities in Contra Costa, with the railroad running from 1891-1978, followed by its use as the much-beloved pedestrian and bicycle trail we enjoy today. This $1.5 million investment in the Iron Horse Trail Double Tracking Pilot is about improving safety and enhancing its use as an active transportation corridor. Creating trail separation allows pedestrians to enjoy their walks on the trail without safety concerns related to faster moving bikes. Bicyclists will be able to use their separated bikeway to get to and from work, school, and transit centers more efficiently,” said Candace Andersen, Contra Costa County Supervisor (District II).

“We are deeply grateful to Mark DeSaulnier for selecting the Downtown Aqueduct Pathway Project for Community Project Funding consideration. The Congressman’s support is instrumental in helping Lafayette advance a transformative project that will create a safe, continuous, and car-free route between neighborhoods, downtown destinations, and regional transit,” said Carl Anduri, Mayor of Lafayette.

“We are deeply grateful to have the Congressman’s support of these projects, which reflect San Ramon’s commitment to modernizing critical infrastructure, enhancing public safety, and investing in technology that improves the daily lives of our residents,” said Mark Armstrong, Mayor of San Ramon. “We value the Congressman’s continued partnership and advocacy on behalf of the San Ramon community and appreciate the opportunity to advance to Committee review of these transformative investments that will strengthen mobility, resilience, and public safety citywide.”

“Thank you to Congressman DeSaulnier for championing innovative solutions to one of the Bay Area’s most critical regulatory challenges: reducing nitrogen discharges to the Bay while keeping costs manageable for wastewater customers. The MABR and DAS Bay Area Regional Demonstration Site will advance technologies aimed at better protecting our beautiful Bay, while potentially saving billions of dollars across our region and beyond. We’re grateful for Congressman DeSaulnier’s vision, leadership, and commitment to clean water infrastructure that benefits our communities and the environment both now and, in the future,” said Roger Bailey, General Manager of the Central Contra Costa Sanitary District.

“Thank you to Congressman DeSaulnier for his leadership and support in strengthening community safety and supporting survivors of violence. The Contra Costa Unsolved Violent Crime & Victim Safety Initiative expands the county’s ability to prioritize and investigate unsolved shootings and increase clearance rates – which is the percentage of crimes that result in an arrest or other official resolution. Moreover, the initiative pairs data-driven investigations with survivor-centered services to keep victims and witnesses safe, rebuild community trust, and make sure families affected by violence received the justice and attention they deserve,” said Diana Becton, Contra Costa County District Attorney.

“We appreciate Congressman DeSaulnier for championing investments that expand opportunities for young people in East County. The Brentwood Youth Center Project will create a new 15,000 square foot facility offering culinary training in healthcare, culinary arts and skilled trades, academic support, and mental health counseling spaces—providing local youth with safe, modern, and accessible resources right in their community. This project strengthens workforce development into career pathways, supports whole person development, and ensures Brentwood’s young residents have the tools they need to thrive,” said Tamia Brown, Executive Director, Contra Costa County Workforce Development Board.

“On behalf of Contra Costa County, I want to thank Congressman DeSaulnier for his steadfast support of Contra Costa County projects that will provide wide-benefits to the community—from transportation safety improvements on Vasco Road and the Byron Highway, to critical investments in youth development, public safety communications, and solutions that strengthen justice for victims and families. His continued partnership ensures we can deliver safer roads, stronger emergency response, expanded youth opportunities, and improved community safety for residents across all of Contra Costa and beyond. We are deeply grateful for his leadership and his commitment to bringing meaningful federal resources home to Contra Costa,” said Diane Burgis, Chair of the Contra Costa County Board of Supervisors.

“We are grateful to Representative DeSaulnier and his team for their support of this critical wastewater infrastructure work,” said Lilia Corona, Mt. View Sanitary District General Manager. “The Next-Generation Pump Station and Collection System Projects will bolster the process of replacing equipment at the end of its service life. We’re excited by this major step forward for sanitary operations in Contra Costa County, which will allow Mt. View Sanitary District to continue delivering exceptional service quality to our customers.”

“We are grateful to Congressman DeSaulnier for supporting these important infrastructure and wildfire mitigation projects. The Camino Pablo Pathway will enhance pedestrian mobility and connect key parts of our community, while the North Orinda Shaded Fuel Break will significantly reduce wildfire risk and strengthen emergency response capabilities across the broader Lamorinda region. These projects represent critical investments in Orinda’s safety, sustainability, and quality of life,” said Brandyn Iverson, Mayor of Orinda.

“We are grateful for the support of Congressman DeSaulnier in advancing the Lamorinda Public Safety Radio Replacement project for funding.  Through replacing and upgrading the radios used by the Lafayette, Moraga and Orinda Police Departments, this project will enhance public safety throughout the region and ensure that law enforcement officers are equipped to address emergency situations, evacuations, and other critical incidents. Congressman DeSaulnier’s efforts are helping to keep our communities and law enforcement officers safe with this critical investment in public safety communications equipment,” said Jon King, Chief of Police for the Moraga Police Department.

“Thank you to Congressman DeSaulnier for supporting our community’s continued efforts to make Vasco Road safer for all who rely on it. The Vasco Road Safety Improvements – Phase 3 Project delivers targeted, community‑supported safety upgrades along the corridor, including proven Federal Highway Administration countermeasures designed to reduce collisions and improve visibility. These improvements will help protect commuters and enhance regional mobility along this critical East County route,” said Warren Lai, Director of Public Works, Contra Costa County.

Lai continued, “We are grateful to Congressman DeSaulnier for his continued leadership and support of vital East County transportation investments. The Vasco Road–Byron Highway Connector Project will reduce cut-through traffic in Byron, improve regional mobility between Contra Costa and San Joaquin counties, and enhance safety by providing a more efficient route for commuters and goods movement. This project represents an important step toward long term connectivity and economic opportunity for the region.”

“We are grateful to Congressman DeSaulnier for advancing Antioch’s Real-Time Operations Center project for federal consideration. This investment reflects the kind of forward-looking public safety infrastructure cities need to serve growing communities, improve coordination across government functions, and deliver smarter, more effective services to the public,” said Bessie Marie Scott, Antioch City Manager.

“Brentwood has a robust agricultural history, and a long-standing legacy of providing fresh produce and products from our locally-owned farms to tables across America. This funding investment represents the next chapter in this story and the future of farming. The Agricultural Technology Innovation Center will bring together agriculture, education, and technology to create jobs, support workforce development, and strengthen our nation’s food systems. Federal investment in critical infrastructure is the key to unlocking this opportunity, and we are grateful for Congressman DeSaulnier’s leadership and vision in advancing a project that delivers both regional and national impact,” said Susannah Meyer, Mayor of Brentwood.

“We are grateful to Congressman DeSaulnier for his strong support of Concord’s Emergency Operations Center upgrades. This investment strengthens our ability to protect residents, coordinate a regional response, and ensure our community is prepared when it matters most,” said Laura Nakamura, Mayor of Concord.

“Thank you to Congressman DeSaulnier for his commitment to strengthening public safety and emergency response across the East Bay. The East Bay Regional Communications System – Mobile Communications Sites on Wheels Project will provide deployable, towable mobile towers that ensure backup radio coverage during disasters, domestic terrorism, or large-scale incidents—significantly enhancing the resiliency, reliability, and interoperability of communications for first responders in Contra Costa and Alameda counties. This investment ensures that when emergencies strike, our communities and safety personnel can rely on a stable, redundant system that keeps critical communications operational when they’re needed most,” said David Swing, Executive Director of the East Bay Regional Communications Authority.

“The City of Walnut Creek greatly appreciates Congressman DeSaulnier’s leadership and continued support in advancing safety for our residents. This critical infrastructure project for a new traffic signal will improve the efficiency of regional traffic, emergency vehicle response times, and safety for all modes of transportation,” said Kevin Wilk, Mayor of Walnut Creek.

Selection and submission of projects to the Appropriations Committee is the first stage of the process for Community Project Funding. Each project submitted must meet the criteria set forth by the Committee, which can be found here, and must then be passed in the Committee and by both the House and Senate before it becomes law. The projects are subject to a strict transparency and accountability process, which is detailed here by the Appropriations Committee. Examples of this vetting include certifying that Members have no financial interest in these projects, an audit of a sampling of these projects by the Government Accountability Office, and a requirement for demonstrated community support and engagement for each submission. More information on each project and the certifications of no financial interest can be found here.

 

 

Filed Under: Environment, Finances, Government, Infrastructure, Legislation, News, Parks, Police, Transportation

Eight public works projects in Contra Costa County, BART receive awards

March 18, 2026 By Publisher Leave a Comment

The Bollinger Canyon Road Bicycle and Pedestrian Overcrossing Project received three awards. Source: ACEC California

Iron Horse Trail Overcrossing in San Ramon named 2026 APWA Project of the Year, two more awards

County Public Works receives three project awards

By Allen D. Payton

Eight public works projects in Contra Costa County and BART received awards from the American Public Works Association (APWA) Northern California Chapter and American Council of Engineering Companies of California (ACEC).

APWA Nor Cal Chapter Awards

The Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road was named the 2026 Project of the Year Winner by the APWA Northern California Chapter. Other winners honored at the 2026 Project Awards Luncheon in Vallejo on March 5th include:

BART for the Next Generation Faire Gates;

Central Contra Costa Sanitary District for the Phase 1 Stream and Aeration Blower Systems Renovations;

City of Antioch for its Brackish Water Desalination Plant (see below);

City of Pleasant Hill for the Contra Costa Blvd. Complete Streets Improvements Projects;

City of Richmond for the Ferry to Bridge to Greenway project;

Contra Costa County Public Works for three projects including the County Administration Building B, Saranap Trash Capture Installation and the Wildcat Canyon Road Slope Failure Repair.

A total of 25 projects were nominated and 15 received an award. All winners will be moving on to the APWA National at Public Works Expo 2026 in Houston, TX in August for consideration.

The APWA Northern California Chapter is a dynamic and engaged community of professionals dedicated to advancing the goals and mission of our association at the local level. The chapter is an integral part of the larger APWA network, representing a vibrant community of professionals in Northern California. We are committed to fostering professional growth, facilitating meaningful connections, and promoting excellence within the industry.

Source: City of San Ramon

Bollinger Canyon Road Overcrossing Project Also Wins League of California Cities Award

The Bollinger Canyon Road Bicycle and Pedestrian Overcrossing Project also received the 2026 Outstanding Local Streets and Roads Project Award from the California State Association of Counties (CSAC), League of California Cities (Cal Cities), and County Engineers Association of California (CEAC). It is the highest award presented annually at the California League of Cities Public Works Officers Institute Spring Conference.

“Counties and cities across California lead in delivering sustainable and enduring transportation projects,” said Johannes Hoevertsz, President of CEAC and Sonoma County Public Infrastructure Director. “By applying innovative approaches, local governments are strengthening mobility while protecting the long-term performance of their streets and roads.”

Source: CA League of Cities

This year’s overall winner, the City of San Ramon, is recognized for its Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road, a transformative project that enhances safety and access for pedestrians and cyclists.

Overall Winner:
Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road, City of San Ramon

The $29M Iron Horse Trail Bicycle and Pedestrian Overcrossing at Bollinger Canyon Road is a 340-foot, cable-stayed bridge that provides a safe, grade-separated crossing over one of San Ramon’s busiest corridors.  Anchored by 900 feet of MSE wall approaches, it eliminates a previously signaled crossing and completes a link in the 30-mile regional Iron Horse Trail system. The project integrated context-sensitive landscaping with over 7,000 native and drought-tolerant plants and 80 trees along with community gathering spaces enhanced by architectural lighting.

“This project represents years of thoughtful planning and hard work from our Engineering team to improve safety and accessibility across one of the city’s busiest roadways,” a Facebook post on Thursday, March 12th reads. “Congratulations to our Engineering team for their dedication and hard work in bringing this important project to life!”

The overcrossing officially opened to the public on Saturday, July 19, 2025.

During the ACEC California awards ceremony on Feb. 19, 2026. Photo: ACEC California

ACEC California Awards

The Contra Costa Transportation Authority and City of San Ramon received an Honor Award from ACEC California, one of eight in the San Francisco Region, for the Iron Horse Trail Overcrossing at Bollinger Canyon Road. The project was submitted by the Oakland office of COWI North America, Inc., of the ACEC California Bay Bridge Chapter.

According to ACEC California, COWI was contracted by the Contra Costa Transportation Authority for the overcrossing project — a striking new pedestrian and cyclist bridge that provides a safe crossing across the busiest arterial corridor in the city and uninterrupted connectivity along the Iron Horse Trail. The City of San Ramon is the owner.

As Prime Consultant and Engineer of Record, COWI led the design, engineering, and design support during construction for the $21.6 million project. The result is a 340-foot, six-span cable-stayed bridge with 570 feet of retaining wall approaches, a central V-shaped steel pylon, and architecturally integrated lighting and railing systems.

The overcrossing enhances safety and connectivity for tens of thousands of San Ramon residents and trail users along the region’s most popular trail. While the project utilized its full budget, COWI’s innovative design and accelerated construction strategies generated substantial indirect savings by minimizing traffic disruption, shortening construction duration, and reducing environmental and community impacts.

“This bridge is a celebration of safe, sustainable design and community placemaking,” said Matt Baughman, Associate Project Director at COWI. “From concept to completion, COWI’s team worked closely with our client and stakeholders to deliver a truly iconic project.”

Source: City of Antioch

There were two other local ACEC California winners including the City of Antioch which received a Merit Award for its Brackish Water Desalination Plant, submitted for consideration by Carollo Engineers’ Walnut Creek office of the East Bay Chapter. The plant was inaugurated on September 15, 2025. According to the City of Antioch, this facility strengthens Antioch’s water supply by using a combination of existing and new infrastructure to increase reliability and provide greater operational flexibility. This facility is a landmark investment in the City’s future, ensuring a more resilient water supply for the community.

The City of Martinez received a Commendation Award from ACEC California for the Alhambra Avenue Downtown Improvements, submitted by LCC Engineering & Surveying, Inc. of Martinez, also of the ACEC California East Bay Chapter.

According to LCC, the company was hired by the City of Martinez in Winter of 2022 to provide land survey and civil design services for this Complete Street Improvement Project which included one mile of mill and fills, base-failure repairs, crack-sealing and micro-surfacing, re-striping to include Class 2 buffered bike lanes, new ADA compliant curb ramps and crosswalks.  The project was a federally funded project which triggered extensive environmental studies due to the proximity to significant historical buildings.  LCC teamed with HDR for the extensive environmental studies required.  However, LCC performed all of the right of way and utility coordination to obtain the Right of Way Certification for the Project. Construction was completed in spring 2025.

LCC has provided civil engineering and land surveying services to the City of Martinez since the firm was established in 1954.

The ACEC California’s annual Engineering Excellence Awards competition recognizes outstanding achievements in engineering and land surveying projects completed by California firms. Entries are accepted into one of 12 project categories: studies, research and consulting engineering services; building/technology systems; structural systems; surveying and mapping technology; environmental; waste and storm water; water resources; transportation; special projects; small projects; energy; and industrial and manufacturing processes and facilities.

Projects were recognized for demonstrating an exceptional degree of innovation, complexity, achievement, and value. Twenty projects earned the prestigious Honor Award distinction, twenty-seven were recognized with Merit Awards, and fifteen Commendation Awards were granted.

“We are proud to recognize these ACEC California firms for delivering an exceptional degree of value and technical excellence to our communities,” said Tyler Munzing, Executive Director of ACEC California. “Quality infrastructure—from dependable drinking water to safe, efficient roadways and structurally sound public spaces—is essential to our state’s success. These award-winning projects showcase how our engineering and land surveying firms are passionately building a more resilient and connected California.”

The awards were announced at the Engineering Excellence Awards Banquet at the Disneyland Hotel on February 19, 2026. Themed “Dream Builders: Engineering the Magic of Tomorrow”, the conference highlighted how engineers and land surveyors can influence the future through innovation, imagination and impact. The annual celebration was also a fundraiser for the ACEC California Scholarship Foundation 501(c)3, which provides scholarship awards to graduate and undergraduate students who are recognized for their notable and outstanding academic achievements.

Learn more about the awards:

2026 Projects of the Year Award – APWA Northern California Chapter

2026 Engineering Excellence Award Winners – American Council of Engineering Companies of California

Filed Under: BART, Business, Central County, Construction, East County, Government, Honors & Awards, Infrastructure, News, San Ramon Valley, West County

California invests $3 billion to enhance safety, improve travel times, boost multimodal travel options

October 22, 2025 By Publisher Leave a Comment

Over $107 million for Contra Costa projects including $46.9 million on Hwy 4 improvements in East County, $42.4 billion on 680 in San Ramon Valley and $14.6 million on Caldecott Tunnel

By Edward Barrera, Division Chief, Caltrans Public Affairs

In August, the California Transportation Commission (CTC) approved $3 billion in allocations to enhance safety and mobility across the state highway system and expand multimodal travel, including bike lanes and pedestrian pathways. Guided by Governor Gavin Newsom’s Build More, Faster – For All infrastructure agenda, these improvements will make California communities safer, cleaner and increase access to active transportation options.

Of the $3 billion allocated, $663 million derives from Senate Bill (SB) 1, the Road Repair and Accountability Act of 2017 and approximately $2 billion from the federal Infrastructure Investment and Jobs Act of 2021 (IIJA). The funds will serve as a catalyst to increase the capacity of the state’s transportation system, rehabilitate aging roadways and improve travel times, while balancing community impacts and promoting environmental benefits.

The “…investments reflect California’s long-term commitment to safer roads, smarter traffic management and expanded transportation choices that get people where they need to go,” said Caltrans Director Dina El-Tawansy.

“The funds allocated…reflect the Commission’s commitment to investing taxpayer dollars strategically. These investments will improve the safety and reliability of the state’s transportation network and support a thriving economy by improving the movement of freight and reducing out-of-pocket expenses for all California,” said Darnell Grisby, Chair of the California Transportation Commission.

Projects in Contra Costa County approved by the Commission include:

  • $46,900,000 on SR-4 in and near Antioch and Brentwood, from Hillcrest Avenue to Byron Highway, to rehabilitate pavement and drainage systems, upgrade facilities to ADA standards, install Accessible Pedestrian Signals (APS), high-visibility crosswalks, bike loop detectors, and construct Class II bike lanes. This will extend pavement service life and improve ride quality.
  •  $42,374,000 on I-680 in San Ramon and Danville, from Alcosta Boulevard to 0.1 mile north of Diablo Road, to rehabilitate pavement, upgrade guardrail, and upgrade facilities to ADA standards. This will extend pavement service life and improve ride quality.
  • $14,584,000 on SR-24 in Orinda, at the Caldecott Tunnel, to rehabilitate and upgrade the ventilation system in Bores 1, 2, and 3. This will ensure structural integrity and prolong tunnel service life.
  • $1,301,000 on SR-4 in Concord, 0.5 mile east of Port Chicago Highway, to reconstruct a failed slope embankment and repair a displaced down drain due to heavy rainfall in February and March 2025. Work includes installing Rock Slope Protection (RSP), and repairing the down drain, guardrail, and dike. This will enhance driver and pedestrian safety.
  • • $1,275,000 on SR-4 near Pittsburg, 0.3 mile west of Bailey Road, to reconstruct a slope embankment and repair a displaced down drain due to heavy rainfall in February and March 2025. Work includes installing Rock Slope Protection (RSP). This will improve roadway safety.
  • $999,000 on SR-24 in Lafayette, from 0.7 to 1.0 mile east of Acalanes Road, to rehabilitate pavement due to ponding and water seepage caused by heavy rainfall in February and March 2025, which led to cracking and settlement. This will extend pavement life and improve safety.

IIJA is a once-in-a-generation investment in our nation’s infrastructure to improve the sustainability and resiliency of our country’s energy, water, broadband and transportation systems. The total funding for California is nearly $54 billion. This includes investments to upgrade the state’s roads, bridges, rail, public transit, airports, ports, waterways and the electric vehicle charging network.

SB 1 has invested approximately $5 billion annually toward transportation projects since its adoption. It provides funding split between the state and local agencies. Road projects progress through construction phases more quickly, based on the availability of funds, including those partially funded by SB 1.

Visit build.ca.gov to learn more about transformative infrastructure projects happening in communities throughout the state.

Filed Under: Construction, Finances, Infrastructure, News, State of California, Transportation

SF Bay Area road, bridge conditions, congestion and safety examined in new report

September 26, 2025 By Publisher Leave a Comment

Source: TRIP

Existing transportation funding strained by rising construction costs, population growth, potential decrease in state gas tax revenue

“115 of 1,374 bridges are rated poor/structurally deficient, with significant deterioration” – TRIP Report

By Carolyn Bonifas Kelly, Director of Communication & Research, TRIP

San Francisco, CA – While additional state and federal transportation funding is allowing California to repair and improve roads and bridges, a new report documents looming challenges including population growth, rising congestion, construction cost inflation and declining fuel-tax revenue. The report by The Road Information Program, TRIP, a national transportation research nonprofit based in Washington, DC, examines California’s road and bridge conditions, congestion and reliability, highway safety, economic development, vehicle travel trends, and the impact of recent state and federal transportation funding increases.

The TRIP report, “Keeping California Mobile: Providing a Modern, Sustainable Transportation System in the Golden State,” finds that throughout the state, traffic fatalities have increased significantly in the last decade despite recent downward trends, 50 percent of major roads are in poor or mediocre condition, five percent of locally and state-maintained bridges (20 feet or more in length) are rated poor/structurally deficient, and traffic congestion costs the state’s drivers $55 billion annually in lost time and wasted fuel. In addition to statewide data, the TRIP report includes regional pavement and bridge conditions, congestion data, highway safety data, and cost breakdowns for the Los Angeles, Riverside-San Bernardino, Sacramento, San Diego, San Francisco-Oakland and San Jose urban areas.

The TRIP report finds that 73 percent of major locally and state-maintained roads in the San Francisco-Oakland urban area are in poor or mediocre condition, costing the average motorist an additional $1,106 each year in extra vehicle operating costs, including accelerated vehicle depreciation, additional repair costs, and increased fuel consumption and tire wear. Statewide, 28 percent of California’s major roads are in poor condition and 22 percent are in mediocre condition. TRIP estimates that the state’s drivers lose $24.2 billion annually in extra vehicle operating costs as a result of driving on deteriorated roads.

In the San Francisco-Oakland area, eight percent of bridges (115 of 1,374 bridges) are rated poor/structurally deficient, with significant deterioration to the bridge deck, supports or other major components. This includes locally and state-maintained bridges that are 20 feet or longer. Statewide, five percent of California’s bridges are rated poor/structurally deficient. Most bridges are designed to last 50 years before major overhaul or replacement. In California, 54 percent of the state’s bridges were built in 1969 or earlier.

According to the TRIP report, traffic congestion in the San Francisco-Oakland area causes 111 annual hours of delay for the average motorist and costs the average driver $3,406 annually in lost time and wasted fuel. On average, San Francisco-Oakland drivers waste 38 gallons of fuel annually due to congestion. Statewide, drivers lose $55 billion annually because of lost time and wasted fuel due to traffic congestion. Due to the Covid-19 pandemic, vehicle travel in California dropped by as much as 41 percent in April 2020 (as compared to vehicle travel during the same month the previous year). By 2025, vehicle miles of travel in California had rebounded to five percent below 2019’s pre-pandemic levels. Congestion reduces job accessibility significantly. In California’s six largest metros, the number of jobs accessible within a 40-minute drive during peak hours were reduced by 44 percent in 2023 as a result of traffic congestion.

Source: TRIP

Traffic crashes in California claimed the lives of 24,508 people from 2019 to 2024. The state’s 2024 traffic fatality rate of 1.19 fatalities for every 100 million miles traveled was slightly lower than the national average of 1.2. The number of traffic fatalities and the fatality rate per 100 million vehicle miles of travel in California spiked dramatically in 2020 and 2021 before falling each year from 2022 to 2024. But, despite recent progress, from 2014 to 2024 the number of traffic fatalities in California increased 24 percent and the state’s traffic fatality rate increased 29 percent. From 2019 to 2023, 30 percent of those killed in California crashes involving motorized vehicles were pedestrians or bicyclists. In the San Francisco-Oakland area, 36 percent of traffic fatalities between 2019 and 2023 (306 of 934) were pedestrians or bicyclists.

“California’s future depends on transportation infrastructure that can withstand the challenges of a changing climate and a growing population,” said Senator Dave Cortese, chair of the California Senate Transportation Committee. “These investments don’t just move people and goods—they cut emissions, strengthen communities, create jobs, and spur economic growth. The TRIP report makes clear that smart infrastructure investments are among the most powerful tools we have to support California’s workforce and drive long-term economic prosperity.”

Improvements to California’s roads, highways and bridges are funded by local, state and federal governments. In April 2017, the California legislature enacted SB 1 — the Road Repair and Accountability Act. SB 1 increased state revenues for transportation by increasing the state’s gasoline and diesel taxes, implementing a transportation investment fee on vehicles and initiating an annual fee on zero emission vehicles. SB 1 is estimated to increase state revenues for California’s transportation system by an average of $5.2 billion annually through to 2027. In addition to state transportation funding, the Infrastructure Investment and Jobs Act (IIJA), signed into law on November 2021, provides $25.3 billion in federal funds to the state for highway and bridge investments in California over five years, representing a 29 percent increase in annual federal funding for roads and bridges in the state over the previous federal surface transportation program. The IIJA is set to expire on September 30, 2026.

“California’s transportation system is the backbone of our daily lives, connecting millions of people to work, school, and opportunity,” said Assemblymember Lori Wilson, chair of the California State Assembly Transportation Committee. “The TRIP report provides the proof points behind what we already know: our infrastructure needs are urgent and growing. As we transition to cleaner vehicles and more sustainable mobility, we must secure fair and reliable funding solutions to ensure tomorrow’s infrastructure serves Californians better than today’s.”

The ability of revenue from California’s motor fuel tax – a critical source of state transportation funds – to keep pace with the state’s future transportation needs is likely to erode as a result of increasing vehicle fuel efficiency, the increasing use of electric vehicles and inflation in highway construction costs. The Federal Highway Administration’s national highway construction cost index, which measures labor and materials cost, increased by 48 percent from the beginning of 2022 through the fourth quarter of 2024.

The California Legislative Analyst’s Office (LAO) found that steps taken by California to reduce greenhouse gas emissions, including programs and policies that are targeted at increasing the adoption of zero-emission vehicles (ZEVs), increasing the use of lower-carbon fuels, and reducing the number of vehicle miles traveled will reduce state transportation revenues by $4.4 billion over the next decade. This reduction in state transportation spending which is projected to result in poorer road conditions. However, the recent federal rollbacks to California strict emissions requirements will impact these programs and policies.

“Our deteriorating transportation system costs Californians lives, time, and money,” said California Transportation Commissioner Joseph Cruz. “Every investment in improving and maintaining our roads, bridges, and transit networks is an investment in people. These projects don’t just build infrastructure – they create good jobs, support local economies, and ensure California’s workforce is at the center of the solution.”

Source: TRIP

The efficiency and condition of California’s transportation system, particularly its highways, is critical to the health of the state’s economy. In 2023 California’s freight system moved 1.4 billion tons of freight, valued at $2.8 trillion. From 2022 to 2050, freight moved annually in California by trucks is expected to increase 65 percent by weight and 100 percent by value (inflation-adjusted dollars). The design, construction and maintenance of transportation infrastructure in California supports approximately 420,000 full-time jobs across all sectors of the state economy. Approximately 7.1 million full-time jobs in California in key industries like tourism, retail sales, agriculture and manufacturing are dependent on the quality, safety and reliability of the state’s transportation infrastructure network.

“California’s transportation dollars are already being stretched thin by increased inflation in construction costs and declining fuel tax revenue,” said Dave Kearby, TRIP’s executive director. “Without additional transportation investment, needed projects that would make the state’s roads safer, smoother and more efficient will not move forward.”

Filed Under: Finances, Government, Infrastructure, News, State of California, Transportation

City of San Pablo wins 3 major Public Works project awards

March 14, 2025 By Publisher Leave a Comment

These awards from the Northern California Chapter of the American Public Works Association (APWA) highlight the City of San Pablo’s extraordinary vision and dedication that are transforming San Pablo into a safer, greener, and more sustainable community. Source: City of San Pablo

By Carl Dameron, Vice President of Public Relations, Strategy Research Institute

The City of San Pablo took home three major awards at the 2025 APWA Project Awards Ceremony, hosted by the Northern California Chapter of the American Public Works Association, on February 20, 2025.

The Rumrill Blvd. Complete Streets Project won both the Small Cities Transportation Project of the Year award and the prestigious Project of the Year awards.

Rendering of improvements to Rumrill Blvd. between Costa Avenue and Market Avenue. Source: City of San Pablo

Additionally, the San Pablo Public Works Department received the Exceptional Performance in Sustainable Practices award, recognizing the City’s commitment to innovative, sustainable projects that benefit both the community and the environment.

Rendering of improvements to Rumrill Blvd. between Market Avenue and San Pablo Avenue. Source: City of San Pablo

“This is an acknowledgement of the City’s commitment to making San Pablo a wonderful community where to reside,” said Allan Panganiban, Public Works Director/City Engineer.

Filed Under: Honors & Awards, Infrastructure, News, Transportation, West County

Caltrans work on Antioch bridge to continue March 17-21

March 14, 2025 By Publisher Leave a Comment

Source: Caltrans

One-way traffic control for maintenance work.

Expect delays & follow flaggers.

Contra Costa County— Caltrans’ scheduled one-way traffic control on the Antioch John A. Nejedly Bridge (SR-160) to continue Monday March 17th from 7 a.m. until 2 p.m.

Southbound SR-160 from the North End of the bridge to the Antioch Toll Plaza will be closed daily from from March 17-21, 2025. Traffic will be able to flow Southbound in the Northbound Lane when clear by flaggers holding traffic coming Northbound at the South End of the Bridge.
The closure will extend the entire length of the bridge.

A pilot car will be implemented and the speed will be restricted to 25 mph in the work zone.

Caltrans will turn on Changeable Message Signs (CMS) to notify the public ahead of time.
For real-time traffic, click on Caltrans QuickMap: http://quickmap.dot.ca.gov/

 

Filed Under: East County, Infrastructure, News, State of California, Transportation

Sand Creek Road Extension in Brentwood now open

February 11, 2025 By Publisher Leave a Comment

Eastbound and westbound views of the now open Sand Creek Road Extension including the bridge over the creek. Herald file photos.

Connects Hwy 4 to Heidorn Ranch Road and Hillcrest Avenue in Antioch

By Allen D. Payton

The City of Brentwood announced on Monday, “The Sand Creek Road Extension is NOW OPEN! We’re thrilled to bring this new roadway to the community and hope it enhances your travels. Please drive safely and enjoy the new route!”

About the delay in the road’s opening two weeks after the ribbon cutting, Assistant City Manager Darin Gale said, “The extension is a unique project because it starts at an intersection that’s controlled by Caltrans and ends at an intersection that’s controlled by Antioch.”

“There were still some items that needed to be completed before we could open the road,” he shared, reiterating what City Manager Tim Ogden said during the ribbon cutting ceremony on Jan. 28. (See related article)

“We appreciate the partnership with those two agencies in getting the road open as quickly as possible” Gale added.

“Part of the intersection built by the developer in Antioch had not yet been approved by the City of Antioch,” he explained as one of the reasons for the delay.

Aerial view of the Sand Creek Road Extension at Heidorn Ranch Road. Source: City of Brentwood

Gale was asked about the timing of the opening and if it had anything to do with the new Costco opening nearby.

He responded, “The City of Brentwood was moving forward with the Sand Creek Road anyway. However, the road does provide a connection to Costco. While it was coincidental to the timing of the opening of Costco, it helped us with attracting the store to Brentwood.”

“We look forward to Sand Creek Road serving the Brentwood Innovation Center (located to the north) and bringing jobs to the residents of East County,” Gale stated.

The new section of the road now connects to the Antioch section at Heidorn Ranch Road, then to Hillcrest Avenue and west to the road that runs north adjacent to Dozier Libbey Medical High School in Antioch.

Gale also reiterated what Antioch Mayor Ron Bernal said at the ribbon cutting, as previously reported. He said, “Richland Communities over to the west of us, they’re going to be starting this year, I’m told, on their subdivision that’s going to build that final link between Sand Creek Road, where it terminates right now, and Deer Valley Road. So, that’s going to be able to get residents and folks over to Kaiser, which is important, getting people off of Deer Valley Road.”

Sand Creek Road will eventually connect to Dallas Ranch Road in Antioch, on the west side of Deer Valley Road and run through The Ranch 1,177-new home subdivision developed by Richland Communities and approved by the Antioch City Council in July 2020.

Filed Under: East County, Infrastructure, News, Transportation, Travel

New Year rings in toll increase at 7 Bay Area bridges

December 27, 2024 By Publisher Leave a Comment

Bay Bridge Toll Plaza. Photo by Noah-Berger. Source: MTC website.

Last of three voter-approved increases takes effect Jan. 1st; failed in Contra Costa County

BATA board also voted last week to increase tolls to $11.50 by 2030 for bridge maintenance and repairs

By John Goodwin, Assistant Director of Communications & Rebecca Long, Director, Legislation & Public Affairs, Metropolitan Transportation Commission

The Bay Area Toll Authority (BATA) reminds drivers that tolls at the region’s seven state-owned toll bridges will go up by $1 next Wednesday, Jan. 1, 2025. This will be the third of the three $1 toll increases approved by the California Legislature in 2017 through state Senate Bill 595 and by voters through Regional Measure 3 (RM3) in June 2018 which passed by 55.07% to 44.93%. The first of these toll hikes went into effect on Jan. 1, 2019, and the second on Jan. 1, 2022. It funds $4.45 billion slate of highway and transit improvements but did not include bridge maintenance and repairs. Regular tolls for two-axle cars and trucks (as well as for motorcycles) at the Antioch, San Francisco-Oakland Bay, Benicia-Martinez, Carquinez, Dumbarton, Richmond-San Rafael and San Mateo-Hayward bridges will rise to $8 from the current $7 on Jan. 1, 2025. Tolls for vehicles with three or more axles also will rise by $1 on Jan. 1, 2025, at all seven of the state-owned toll bridges: to $18 for three axles, $23 for four-axles, $28 for five axles, $33 for six axles, and $38 for combinations with seven or more axles. Regional Measure 3 continues the peak-period toll discount for motorcycles, qualifying carpools and qualifying clean-air vehicles crossing any of the state-owned toll bridges on weekdays from 5 a.m. to 10 a.m. and from 3 p.m. to 7 p.m. The discounted toll will rise to $4 on Jan. 1 from the current $3.50. To qualify for this discount, carpoolers, motorcyclists and drivers of clean-air vehicles must use FasTrak® to pay their tolls electronically and must use a designated carpool lane at each toll plaza. Contra Costa Voters Opposed Ballot Measure According to Ballotpedia, RM3 raised bridge tolls in the Bay Area—excluding tolls for the Golden Gate Bridge—by $3 over six years to fund the Bay Area Traffic Relief Plan, including a $4.5 billion slate of transportation projects. It was on the ballot for voters in the city and county of San Francisco and the following counties: Contra Costa, Alameda, Marin, Napa, San Mateo, Santa Clara, Solano and Sonoma. Voters in two of the counties most affected by the bridge tolls rejected RM3. The vote in Contra Costa County was 44.54% opposed to 55.465 in favor and Solano County voters overwhelmingly opposed it 30.03% to 69.97%. But voters in the other seven counties approved the measure. Alameda County where voters and commuters are also most affected by bridge toll increases passed RM3 by 53.89% to 46.11% The vote margin was closest in Napa County, where voters approved the measure 50.7 percent to 49.3 percent.

Source: Ballotpedia

Senate Bill 595 and Regional Measure 3 also established a 50-cent toll discount for two-axle vehicles crossing more than one of the state-owned toll bridges during weekday commute hours of 5 a.m. to 10 a.m. and 3 p.m. to 7 p.m. To be eligible for the toll discount, which is to be applied to the second toll crossing of the day, motorists must pay their tolls electronically with FasTrak®. Carpools, motorcycles and qualifying clean-air vehicles making a second peak-period toll crossing in a single day will qualify for an additional 25-cent discount off the already-discounted carpool toll. New FasTrak® customers can obtain toll tags at Costco warehouse stores and select Walgreens stores around Northern California. A complete list of participating locations — as well as an online enrollment and registration feature — is available on the FasTrak® Web site at bayareafastrak.org. Customers also may enroll in the FasTrak® program by phone at 1-877-229-8655; by calling 511 and asking for “FasTrak” at the first prompt; or in person at the FasTrak® customer service center at 375 Beale Street in San Francisco. FasTrak® can be used in all lanes at all Bay Area toll plazas. Major projects in the Regional Measure 3 expenditure plan include improvements to State Route 37 in the North Bay, freeway interchange improvements in Alameda, Contra Costa and Solano counties, the purchase of more new BART cars, extension of the BART system from Berryessa to downtown San Jose and Santa Clara, extension of the Caltrain corridor to the Salesforce Transit Center in downtown San Francisco, expansion of Muni’s transit vehicle fleet, expansion of San Francisco Bay Ferry service and more frequent transbay bus service, an improved connection between northbound U.S. 101 and the Richmond-San Rafael Bridge in Marin County, upgrades to the Dumbarton Bridge corridor, and extension of the SMART rail system to Windsor and Healdsburg in Sonoma County. In Addition to Recently Approved Bridge Toll Hikes Beginning Jan. 1, 2026

The Regional Measure 3 toll hike that takes effect next week is separate from the 50 cents per year toll hikes approved by BATA earlier this month, which will be phased in over five years, beginning Jan. 1, 2026, to pay for the maintenance, rehabilitation and operation of the seven state-owned toll bridges. It will increase tolls by 2030 to $11.50 for those who don’t use FasTrak and $10.50 for those who do. BATA this month also approved updates to the policies for high-occupancy vehicles on approaches to the state-owned bridges, which will similarly go into effect on Jan. 1, 2026. (See related article)

BATA, which is directed by the same policy board as the Metropolitan Transportation Commission (MTC), administers toll revenues from the Bay Area’s seven state-owned toll bridges. Toll revenues from the Golden Gate Bridge are administered by the Golden Gate Bridge, Highway and Transportation District, which joined with BATA to operate a single regional FasTrak® customer service center in San Francisco. MTC is the transportation planning, financing and coordinating agency for the nine-county San Francisco Bay Area. Allen D. Payton contributed to this report.

Filed Under: Bay Area, Finances, Infrastructure, News, Taxes, Transportation

BATA board approves annual toll increases to $11.50, HOV lane policy changes

December 23, 2024 By Publisher 1 Comment

Photos source: BATA

For $2 billion in maintenance, preservation and operation of Bay Area’s seven state-owned bridges.

Contra Costa’s representatives voted in favor of 50-cent annual increases beginning Jan. 1, 2026.

By Allen D. Payton

After extending the period for public input, on Wednesday, Dec. 18, 2024, the Bay Area Toll Authority (BATA) Board of Directors voted 15-0-1 to approve toll increases and other toll policy changes for the Bay Area’s seven state-owned bridges beginning Jan. 1, 2026. Tolls will increase to as much as $11.50 by 2030.

According to BATA spokesman John Goodwin, the vote passed “by all 16 members present save one abstention from a brand-new commissioner, Alameda Mayor Marilyn Ezzy-Ashcraft, who represents the cities of Alameda County.”

The board consists of 21 members, with 18 voting members, he shared. Pleasant Hill Mayor Sue Noack, who represents the cities of Contra Costa, and Contra Costa District 5 Supervisor Federal Glover, who represents the County, both voted in favor of the toll increases.

A phased toll increase starting in 2026 is proposed to fund the Toll Bridge Capital Improvement Plan, which includes almost $2 billion of investment which will be used exclusively for the maintenance, preservation and operation of the San Francisco-Oakland Bay Bridge and the Antioch, Benicia-Martinez, Richmond-San Rafael, Carquinez, Dumbarton and San Mateo-Hayward bridges.

The Bay Area’s seven state-owned toll bridges are structurally sound and in good repair. State law requires BATA — working in partnership with Caltrans — to keep them that way.

The toll increases are separate from the $3 increase approved by Bay Area voters in 2018 through Regional Measure 3 to finance a comprehensive suite of highway and transit improvements around the region. The first of the three $1 Regional Measure 3 increases went into effect in 2019, followed by another in 2022. The last of the RM 3 toll hikes will go into effect Jan. 1, 2025, bringing the toll for regular two-axle cars and trucks to $8.

Summary of the 2026 Toll Increase

Toll rates include the last voter-approved Regional Measure 3 (RM 3) toll increase that goes into effect January 1, 2025.

To encourage electronic toll payment with FasTrak® tags, tolls and help recoup the increased costs of collecting tolls via pre-registered license plate accounts or invoices, on Jan. 1, 2027 will also rise by 25 cents for customers who pay with a pre-registered license plate account and on January 1, 2027 will rise by $1 for tolls paid by invoice.

Two-Axle Vehicle Toll increase schedule 2026-30. Source: BATA

Toll Increase: Two-Axle Vehicle Toll

The toll rate update includes an increase of 50 cents a year from 2026 through 2030 for two-axle vehicles. This phased-in approach is similar to the Golden Gate Bridge’s recent multi-year update to its toll schedule.

*HOV rate is 50% of two-axle FasTrak rate.

Three-Axle or More Vehicle Toll increase schedule 2026-30. Source: BATA

Toll Increase: Three-Axle or More Vehicle Toll

Tolls for multi-axle vehicles also will rise by 50 cents per axle per year from 2026 through 2030.

Multi-axle differential pricing:

  • Invoices: +$1.00 per transaction starting January 1, 2027
  • License plate account: + $0.25 per transaction starting January 1, 2027

A Precedent for Tiered Pricing

The Golden Gate Bridge, Highway and Transportation District has used a tiered pricing schedule at the Golden Gate Bridge since 2014.

Golden Gate Bridge tolls by July 2028 will range from $11.25 for FasTrak to $11.50 for license plate accounts to $12.25 for invoice customers.

Summary of the Changes to High-Occupancy Vehicle (HOV) Policies

BATA is also making changes to HOV policies. To provide regional consistency and to support the future deployment of open-road tolling at the state-owned bridges, the changes will establish a uniform three-person occupancy requirement for the discounted toll during weekday commute periods at all seven bridges. It will also allow vehicles with two occupants to use the carpool lanes on the approaches to all bridges except the San Francisco-Oakland Bay Bridge. These two-occupant vehicles will not receive the discounted toll but will be able to use the carpool lanes to save time traveling through the toll plazas.

BATA’s existing toll schedule allows vehicles with three or more occupants (HOV 3+) a discounted toll (half-price), with a two-person (HOV 2+) occupancy requirement for the discounted tolls at the Dumbarton and San Mateo-Hayward bridges. To provide regional consistency and to support the future deployment of open-road tolling at the state-owned bridges, the new policy will establish a uniform three-person occupancy requirement for the discounted toll during weekday commute periods at all seven bridges. The discounted toll rate is available weekdays from 5 to 10 a.m. and from 3 to 7 p.m.

The policy changes will also allow vehicles with two occupants to use the carpool lanes on the approaches to the Antioch, Benicia-Martinez, Carquinez, Dumbarton, Richmond-San Rafael and San Mateo-Hayward bridges. These two-occupant vehicles will not receive the discounted toll but will be able to use the carpool lanes to save time traveling through the toll plazas. There will be no change at the San Francisco-Oakland Bay Bridge, where volumes of vehicles with three or more occupants are much higher than those at other bridges. Use of the carpool lanes on approaches to the Bay Bridge will still require a minimum of three occupants.

In addition to establishing region-wide consistency for the carpool toll discount, the policy changes are designed to:

  • Improve safety on the toll bridge approaches by minimizing “weaving” between lanes.
  • Optimize lane configurations as now-obsolete toll booths are removed as part of the bridges’ transition to open-road tolling.
  • Increase person-throughput by prioritizing access for buses and carpools.

Read more about the BATA toll increases, here.

See BATA Board meeting agenda items 24-1571 through 24-1575. Watch meeting video.

 

 

Filed Under: Bay Area, Finances, Infrastructure, News, Taxes, Transportation

Unnecessary toll hikes will strap middle income drivers in Contra Costa and beyond

November 21, 2024 By Publisher Leave a Comment

The Richmond-San Rafael Bridge. Photo: MTC

By Marc Joffe

As if the $1 toll hike on January 1, 2025, is not enough, commissioners at the Bay Area Toll Authority (BATA) plan to approve a series of five fifty cent increases starting in 2026. By 2030, tolls on the Bay Area’s seven state-owned bridges will reach $10.50 for FasTrak users and $11.50 for drivers paying by invoice. Included in the increase are these four bridges with landings in Contra Costa County:

  • Antioch (Senator John A. Nejedly) Bridge
  • Benicia-Martinez (George Miller) Bridge
  • Carquinez Bridge
  • Richmond-San Rafael Bridge

Aside from toll hikes, motorists are facing a gasoline price increase arising from the California Air Resources Board’s recent imposition of the Low Carbon Fuel Standard. According to a research center at the University of Pennsylvania, LCFS could cost drivers up to 85 cents extra per gallon. And this is on top of California’s highly elevated fuel prices, driven by taxes that rise annually under SB1 (2018).

Despite increasing maintenance costs, the Bay Area bridges are quite profitable. BATA expects total revenue of $1.058 billion this year. The costs of operating the bridges, running FasTrak, and paying debt service are projected to total just $757 million, leaving $300 million to spare.

As BATA admits in its own FAQ on the toll increase, $3.00 of the current $7.00 toll is already being siphoned off for purposes other than bridge operations, maintenance, and seismic safety (this will increase to $4.00 of $8.00 on January 1). For example, almost $6 million is diverted annually to the Transbay Joint Powers Authority to operate its empty bus terminal and to pursue its hopeless plan to bring high-speed rail trains into the Salesforce Transit Center. Bridge toll money is also being used to subsidize Bay Area ferries, SF Muni, AC Transit, Golden Gate Transit, and the NAPA Vine bus service.

The toll hike on the Antioch Bridge is especially egregious. BATA is charging the same tolls on all its bridges despite their vastly different lengths. The Bay Bridge is 8.4 miles long while the Antioch Bridge is just 1.8 miles long. Also, unlike all other Bay Area bridges, the Antioch Bridge has just one lane in each direction.

And then there is the question of income. While many Bay Area drivers are wealthy enough to easily absorb the toll hike, that is less true of people living near the Antioch Bridge. According to Census Reporter, Antioch’s per capita income is only 56 percent of the average for the San Francisco-Oakland-Fremont metro region. Rio Vista, the first sizable community on the north side of the bridge, clocks in at just 67 percent of the metro area’s income per person.

At minimum, BATA should exempt the Antioch Bridge from its planned toll hikes. But better yet, the Authority should shelve its entire toll increase plan, stop siphoning off toll money for other purposes, and live within its means.

Marc Joffe is President of the Contra Costa Taxpayers Association.

Filed Under: Bay Area, Finances, Government, Infrastructure, Opinion, Taxes, Transportation

  • 1
  • 2
  • 3
  • Next Page »
Deer-Valley-Chiro-06-22

Copyright © 2026 · · Contra Costa Herald · All Rights Reserved